Construction Phase Plan Template
A free construction phase plan template compliant with CDM 2015 regulations. Covers site management, risk controls, emergency procedures, and welfare arrangements.
What is a Construction Phase Plan Template?
A construction phase plan is a document required under CDM 2015 (Regulation 12) that sets out the health and safety arrangements for the construction phase of a project. It must be prepared by the principal contractor before the construction phase begins.
The plan is a practical document that records the arrangements for managing the significant health and safety risks associated with the construction work. It is not meant to be a generic health and safety policy - it must be specific to the project.
The HSE guidance states that the plan should be proportionate to the scale and complexity of the project. A small refurbishment will have a shorter, simpler plan than a major new-build.
Key Sections to Include
A CDM 2015 compliant construction phase plan should include:
1. Description of the Project - What is being built, where, for whom, and the expected duration.
2. Management Structure - Who is the client, principal designer, principal contractor, and other key duty holders. Organisation chart and communication lines.
3. Arrangements for Managing Health and Safety - How risks will be managed, how RAMS will be controlled, how competency will be verified, and how subcontractors will be managed.
4. Site Rules - Specific rules for the site including PPE requirements, speed limits, access restrictions, permit-to-work requirements, and prohibited activities.
5. Specific Risk Management - How the project will manage key risks: working at height, excavations, temporary works, lifting operations, traffic management, services (utilities), and any other significant risks identified in the pre-construction information.
6. Emergency Procedures - Fire plan, first aid provision, emergency contacts, evacuation routes, and procedures for serious incidents.
7. Welfare Arrangements - Toilets, washing facilities, changing rooms, rest areas, and drinking water provision.
8. Site Induction - What the site induction will cover and who is responsible for delivering it.
9. Monitoring and Review - How the plan will be monitored and updated as the project progresses.
Free Template
CONSTRUCTION PHASE PLAN Project: [Project Name] Document Ref: [CPP-001] Revision: [A] Date: [DD/MM/YYYY] Prepared by: [Name, Role] 1. PROJECT DESCRIPTION Project Name: [Name] Site Address: [Address] Client: [Client Name] Description of Works: [Brief description] Expected Duration: [Start date] to [End date] Estimated Peak Workforce: [Number] Notifiable Project: [Yes/No] F10 Notification Number: [If applicable] 2. KEY DUTY HOLDERS | Role | Name | Company | Contact | |------|------|---------|---------| | Client | [Name] | [Company] | [Phone/Email] | | Principal Designer | [Name] | [Company] | [Phone/Email] | | Principal Contractor | [Name] | [Company] | [Phone/Email] | | Site Manager | [Name] | [Company] | [Phone/Email] | | H&S Advisor | [Name] | [Company] | [Phone/Email] | 3. MANAGEMENT ARRANGEMENTS 3.1 RAMS Procedure: [How RAMS will be submitted, reviewed, and approved] 3.2 Subcontractor Management: [How subcontractors will be assessed and managed] 3.3 Communication: [Regular meetings, notice boards, briefings] 3.4 Competency Verification: [CSCS, qualifications, training records] 4. SITE RULES - All personnel must attend site induction before starting work - Minimum PPE: [List requirements] - Working hours: [Start] to [Finish] - Site speed limit: [mph] - No lone working without permit - Permits required for: [List activities] - [Additional site-specific rules] 5. SIGNIFICANT RISKS AND CONTROLS | Risk | Control Measures | Responsible | |------|-----------------|-------------| | Working at Height | [Controls] | [Role] | | Excavations | [Controls] | [Role] | | Lifting Operations | [Controls] | [Role] | | Temporary Works | [Controls] | [Role] | | Services/Utilities | [Controls] | [Role] | | Traffic Management | [Controls] | [Role] | 6. EMERGENCY PROCEDURES Fire Assembly Point: [Location] First Aid Room: [Location] First Aiders: [Names] Emergency Services Contact: 999 Site Emergency Contact: [Number] Nearest Hospital: [Name, Address, Distance] Evacuation Signal: [Description] 7. WELFARE FACILITIES | Facility | Location | Capacity | |----------|----------|----------| | Toilets | [Location] | [Number] | | Washing | [Location] | [Number] | | Changing | [Location] | [Number] | | Rest Area | [Location] | [Number] | | Drying Room | [Location] | [Number] | 8. SITE INDUCTION CONTENT - Project overview and key risks - Site rules and PPE requirements - Emergency procedures and assembly points - Welfare facility locations - Reporting procedures for incidents and near-misses - Environmental requirements - [Additional project-specific items] 9. MONITORING AND REVIEW This plan will be reviewed: [Monthly/When significant changes occur] Review responsibility: [Name and Role] APPROVAL Prepared by: _________________ Date: _________ Approved by: _________________ Date: _________
When Do You Need This?
A construction phase plan must be prepared before the construction phase of any project where CDM 2015 applies (which is all construction projects in the UK). The principal contractor is responsible for preparing, maintaining, and updating the plan throughout the project.
Who Uses This Template?
Principal Contractors prepare the plan. Site Managers implement it daily. Health and Safety Managers audit compliance. The Client must ensure the plan is in place before construction begins. Subcontractors must comply with the arrangements set out in the plan.
Generate This with AI
AI can generate a solid first draft of a construction phase plan in about 15-20 minutes. Provide the AI with: project description, key duty holders, significant risks identified in pre-construction information, and any client-specific requirements. The AI will structure these into a CDM 2015 compliant format. Always have a competent person review the final document.
Template Details
- Cost
- Free
- Format
- Copy-paste ready
- Industry
- Construction
Related AI Workflows
Want to generate this document automatically with AI? Check our AI workflows for step-by-step prompts.
Try our software
Want these prompts pre-built?
AI Construction Copilot has all these workflows ready to run — no copy-pasting needed. Built specifically for construction professionals.