Free AI RAMS Generator
Describe the task, the site and the equipment, and the AI RAMS generator drafts a risk assessment and method statement in one document: hazards scored for likelihood and severity, control measures, a step-by-step sequence, PPE and emergency arrangements. It's a first draft. A competent person must check it against the site and sign it off.
Editor: Owen HaggerLast updated
How does the AI RAMS generator work?
- 1
Describe the task
Enter the activity, site, hazards, and equipment.
- 2
Generate the draft
The AI produces a full RAMS in seconds.
- 3
Review and sign off
Check it against your site and approve it.
Generate your RAMS now
Answer a few quick questions about your task and get a full Risk Assessment and Method Statement draft, sent straight to your inbox.
Launch the RAMS GeneratorFree to use. Opens in a new tab.
What does an AI-generated RAMS include?
Each draft covers the sections a principal contractor expects to see:
- Scope of works: what the task is and where it happens.
- Risk assessment: each hazard, who is at risk, a likelihood and severity score before and after controls, and the control measures.
- Method statement: a step-by-step sequence from set-up to clear-up.
- PPE: what everyone doing the task needs to wear.
- Competence: the training, cards and tickets the task needs.
- Emergency arrangements: first aid, emergency contacts and what to do if something goes wrong.
What does a sample output look like?
Sample output: illustrative only, not for use on site without review
Task: installing internal metal stud and plasterboard partitions on an upper floor of an occupied-building refurbishment, using podium steps and a mobile access tower for the head track.
Scope: set out, fix head and floor track, install studs at the specified centres, fit insulation, board both sides with plasterboard, tape and fill. Services in the zone are isolated or confirmed clear before fixing.
Risk assessment (likelihood x severity, each scored 1 to 5):
| Hazard | Who's at risk | Before controls | Controls | After controls |
|---|---|---|---|---|
| Falls from podium steps or mobile tower when fixing head track | Operatives | 3 x 4 = 12 | Tower erected by PASMA-trained person and inspected before use, guardrails and toe boards fitted, brakes on, no overreaching, podium steps with gates closed | 1 x 4 = 4 |
| Manual handling of full plasterboard sheets | Operatives | 4 x 3 = 12 | Two-person lift for full sheets, board trolley from the hoist to the work area, boards stored flat near the point of use | 2 x 3 = 6 |
| Dust from cutting and sanding board and filler | Operatives, others nearby | 3 x 3 = 9 | Score and snap rather than power cutting, on-tool extraction for any sanding, FFP3 masks where extraction can't be used, area screened off | 1 x 3 = 3 |
| Striking hidden services when fixing to the slab or soffit | Operatives, building users | 2 x 5 = 10 | Check the services drawings, scan before drilling, permit for any work near live services | 1 x 5 = 5 |
| Cuts from metal stud and track | Operatives | 3 x 2 = 6 | Cut-resistant gloves, snips kept sharp, offcuts binned as you go | 2 x 2 = 4 |
| Slips and trips from offcuts and cables | Everyone on the floor | 3 x 2 = 6 | Clear as you go, cables routed at height or along walls, daily housekeeping check | 1 x 2 = 2 |
Method statement (first steps):
- Supervisor briefs the gang on this RAMS and records attendance before work starts.
- Confirm the services in the partition zone are isolated or marked, and the floor is clear.
- Erect and inspect the mobile tower, record the inspection, and set out the partition lines.
- Fix the floor track, then the head track from the tower, working within the guardrails.
PPE: hard hat, safety boots, hi-vis, cut-resistant gloves, safety glasses, FFP3 mask when cutting or sanding without extraction.
Sign-off: this draft must be checked against the actual site, the principal contractor's rules and the construction phase plan, then signed off by a competent person before use.
Your output will reflect the task, site and equipment you describe.
Is an AI-generated RAMS good enough to use on site?
Not as it comes out. It's a first draft, and the duty to make it right for the job stays with the people doing the work. Used properly, it gets the structure and the standard controls down quickly so the time goes on the parts that matter.
Before it's used, someone competent in the task, meaning they have the right training, knowledge and experience for this work, needs to check it against the actual site. That means the real access and working areas, the plant you're actually bringing, other trades working nearby, the principal contractor's site rules and the construction phase plan. Change anything that doesn't match, add what's missing, then sign it off and brief it to everyone doing the work.
What does AI miss in a RAMS?
It only knows what you tell it, so the gaps are usually the things that make your site different:
- Site-specific hazards: an occupied building, a busy public footpath, an asbestos register entry, a weak floor.
- Sequencing clashes with other trades: who else is working on the floor, above you or below you at the same time.
- Emergency routes: the actual escape routes, assembly point and first aiders on this site, not generic ones.
- The client's and principal contractor's own rules: permits, hours, exclusion zones and induction requirements.
Read the draft with these in mind and add them before sign-off.
New to RAMS?
A RAMS combines a risk assessment and a method statement in one document. For what to include and why, read what is a RAMS, or start from the editable RAMS template and method statement template. For related jobs, try the COSHH risk assessment workflow and the toolbox talk workflow, or see everything on AI for risk assessment.
Frequently asked questions
Is the AI RAMS generator free?
Yes. The AI RAMS generator is free to use. You enter your task details and receive a structured risk assessment and method statement draft. You provide an email address so the finished document can be sent to you, and there's no charge for the draft or for using the generator again on another task.
Is an AI-generated RAMS legally valid?
An AI-generated RAMS is a first draft, not a finished document. It must be reviewed, tailored to the actual site, and signed off by a competent person before use. Used that way it is just as valid as one written from scratch, and far quicker to produce. What makes a RAMS valid is the review and sign-off, not who typed it.
What does the generator produce?
A complete RAMS draft: scope of works, a risk assessment table with likelihood and severity scoring and control measures, a step-by-step method statement, required PPE, competence requirements, and emergency arrangements. You then edit it for your site, add anything specific to the job, and have it signed off before the work starts.
Does it follow UK regulations?
The output is built around UK practice, referencing CDM 2015 and the Management of Health and Safety at Work Regulations 1999. You should always check it against your own site conditions, the principal contractor's rules and your company procedures, because the generator only knows what you tell it about the task and the site.
What happens to my email address and the document?
The generator runs on Formwise, which emails the finished draft to the address you enter, so use an address you can get to on site. Check the draft before anyone relies on it. Our privacy policy explains how BuildCopilot handles personal data.
Free Weekly Newsletter
Get Construction AI Tips in Your Inbox
New workflows, prompts, and templates delivered weekly. Join construction professionals already saving hours with AI.
No spam. Unsubscribe anytime.