Draft a Contract Change Order

Generate a formal contract change order or project manager's instruction with scope, cost, programme impact, and approvals.

IntermediateContracts ManagerVariation Management

Overview

This workflow enables Contracts Managers to produce a properly formatted contract change order or Project Manager's instruction that captures the scope of a variation, its cost and programme implications, and the required approval chain. The output is suitable for formal issue under NEC4 or JCT contract procedures and ensures all necessary information is documented for valuation and administration.

Want all 50 prompts in one downloadable pack?

The Construction AI Prompt Pack includes every workflow prompt, 13 editable templates, and role-specific cheat sheets.

Get the Pack - £29

Instant download

Prompt

You are an experienced UK construction Contracts Manager. Draft a formal contract change order based on the following:

Contract Form: [CONTRACT FORM, e.g., NEC4 ECC Option A / JCT SBC/Q 2016]
Project: [PROJECT NAME]
Change Order Number: [CO NUMBER, e.g., CO-027]
Date of Issue: [DATE]
Originated By: [NAME AND ROLE]

Change Description:
- Title: [BRIEF TITLE, e.g., Additional fire stopping to risers at Levels 2-5]
- Detailed scope: [DESCRIBE THE CHANGE IN DETAIL, including affected areas, specifications, drawings]
- Reason for change: [REASON, e.g., Design development / Employer requirement / Unforeseen condition / Statutory requirement]
- Relevant drawings: [LIST DRAWING NUMBERS AND REVISIONS]
- Relevant specifications: [SPEC REFERENCES]

Cost Impact:
- Contractor's quotation reference: [REF AND DATE]
- Quoted amount: [VALUE]
- Assessed fair value (if different): [VALUE]
- Basis of valuation: [e.g., Measured rates from BoQ / Defined cost + fee / Daywork / Lump sum quotation]
- Impact on provisional sums: [IF APPLICABLE]

Programme Impact:
- Affected activities: [LIST ACTIVITIES]
- Estimated time impact: [DURATION, e.g., 5 working days]
- Impact on completion date: [YES/NO AND EXPLANATION]

Structure the change order as:
1. Header with project details, CO number, date, and distribution
2. Change order description and scope of works
3. Reason and justification
4. Drawings and specifications affected
5. Cost assessment with breakdown
6. Programme impact statement
7. Contractual basis (cite relevant contract clauses for instruction and valuation)
8. Approval signatures block (Originated by / Checked by / Approved by)
9. Distribution list

Format as a professional document ready for printing and signature.

Use Case

Use when a variation has been agreed or instructed and you need to formally document it as a contract change order with full scope, cost, and programme details for the project record.

Recommended Tool

Microsoft Copilot
AI built into Microsoft 365. Perfect for construction firms using Word, Excel, PowerPoint, and Teams.
AI AssistantIncluded with M365 Copilot
Learn more →

Related Guide

AI for Contract Administration in Construction
How to use AI to manage contracts, variations, claims, and contractual correspondence more efficiently in construction.
Intermediate11 min read
All 50 Prompts

Get every prompt in one pack

Stop copy-pasting one prompt at a time. The Construction AI Prompt Pack includes all 50 workflows as editable documents, organised by role, ready to use offline.

£29one-time
Get the Prompt Pack

Instant download. Editable files.

Try our software

Want these prompts pre-built?

AI Construction Copilot has all these workflows ready to run — no copy-pasting needed. Built specifically for construction professionals.

Try Free
Free newsletter

Get AI Tips Weekly

New construction AI workflows, prompts, and templates delivered to your inbox every week.

Subscribe Free

No spam. Unsubscribe anytime.