Generate a Preliminary Cost Plan
Quickly generate a structured elemental cost plan for early-stage construction projects using AI.
Editor: Owen HaggerLast updated
Overview
This workflow helps Quantity Surveyors create preliminary cost plans at RIBA Stage 2-3. It generates an elemental breakdown using standard categories, allowing you to quickly produce a first draft cost plan that can then be refined with project-specific rates and quantities.
Want more templates like this?
Get new AI workflows and construction templates delivered weekly. Free.
Subscribe Free
No spam ever.
Prompt
You are an experienced UK Quantity Surveyor. Generate a preliminary elemental cost plan for the following project: Project: [PROJECT TYPE, e.g., New-build secondary school] Location: [LOCATION, e.g., Greater Manchester] Gross Internal Floor Area: [GIFA, e.g., 8,500 sqm] Storeys: [NUMBER, e.g., 3] Construction Start: [DATE, e.g., Q2 2025] Budget Envelope: [BUDGET, e.g., £18M] Present the cost plan as a table with columns: - Element (using NRM1 categories) - £/sqm Rate - Total Cost - % of Total Include: Facilitating Works, Substructure, Superstructure, Internal Finishes, Fittings & Furnishings, Services, External Works, Preliminaries, Overheads & Profit, and a Contingency allowance. Add brief notes explaining key assumptions and exclusions.
Typical result
~8hby hand~3hwith AI
A cautious typical estimate, including the time to gather the inputs and check the output. It varies with the job.
What it replaces: Building an early cost plan by hand from benchmarks.
What you still check
- Rates come from your own cost data, not AI guesses
- Quantities and gross internal floor area are right
- Assumptions and exclusions are written down
Example Output
PRELIMINARY COST PLAN: New-Build Secondary School Location: Greater Manchester | GIFA: 8,500 sqm | 3 Storeys | Element | £/sqm | Total | % of Total | |------------------------------|--------|--------------|------------| | 0 Facilitating Works | £35 | £297,500 | 1.7% | | 1 Substructure | £145 | £1,232,500 | 7.0% | | 2 Superstructure | £485 | £4,122,500 | 23.4% | | 3 Internal Finishes | £165 | £1,402,500 | 8.0% | | 4 Fittings & Furnishings | £95 | £807,500 | 4.6% | | 5 Services | £420 | £3,570,000 | 20.3% | | 6 External Works | £110 | £935,000 | 5.3% | | 7 Preliminaries (14%) | £204 | £1,731,300 | 9.8% | | 8 OH&P (6%) | £99 | £845,850 | 4.8% | | 9 Design Risk Contingency | £105 | £892,500 | 5.1% | | 10 Construction Contingency | £105 | £892,500 | 5.1% | | TOTAL | £1,968 | £16,730,150 | 95.2% | Assumptions: - Rates based on BCIS median for secondary schools in NW England, Q1 2025 - Excludes: VAT, professional fees, land costs, Section 106 contributions - Includes for enhanced acoustic and ventilation requirements
Use Case
Use this at RIBA Stage 2 or Stage 3 when you need to produce a quick cost plan for client budget discussions. Replace the placeholder values with your actual project details.